| DOE-EM-STD-5505-96
APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
FINDING:
Transfer from R Rail Car to Tank Farm Procedure Steps 5.5.49.16 and Steps 5.5.47.1. through
5.5.47.9 are not in a logical order. (Reference: 1, 4)
FINDING:
Transfer from AR Rail Car to Tank Farm Procedure only references actions for alarms at R and
does not reference actions for alarms received at CASS, A, or at CR. (Reference: 1, 4)
FINDING:
Procedure TO-250-550, "Transfer from R to TK-12" did not include the Independent Verification
Self Checking Techniques checklist as required in reference 5. (References: 1, 5)
DISCUSSION: Independent verification associated with procedure TO-250-550 was
performed correctly by the workers involved; however, they did not use the checklist as
required. The Cognizant Engineer and workers performing the procedure were not aware of
the checklist.
OPERATOR AID POSTINGS
REFERENCES:
1. DOE 5480.19, Chapter XVII
2. IP-0842 Vol II Section 4.17.1
FINDING:
Operator Aids 2E-91-005 and 2E-94-010 are not labeled correctly. (References: 1, 2)
FINDING:
The Operator Aid Audit Checklist (Attachment C to IP-0842 Vol II Section 4.17.1) is not used.
(References: 1, 2)
FINDING:
The Operator Aid Index (Attachment B to IP-0842 Vol II Section 4.17.1) is not used.
(References: 1, 2)
FINDING:
Operator Aid 2E-92-003 references a source document which was approved after the Operator
Aid. (Reference: 1, 2)