Click here to make tpub.com your Home Page

Page Title: Documentation of the ORR Results (Both Responsible Contractor and DOE).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-3006-2000
enforceable mechanism. These requirements should be appropriately implemented in the facility, or
appropriate compensatory measures, formally approved, have been put in place during the period prior to
full implementation. The ORR team should provide their assessment as to whether or not this set of
requirements is adequate to maintain protection of the public health and safety, worker safety, and the
environment.
This conclusion shall be based on:
(1) Review of the program to document conformance with the agreed upon set of requirements,
including a process to address new requirements; and
(2) Extensive use of references to the established requirements in the ORR documentation.
Team members are asked to concur in the DOE ORR Final Report. Any dissenting opinions are
documented and attached to the report. The ORR Final Report is transmitted by the team leader to the
authorization authority as designated in the ORR plans-of-action. In most instances, the ORR Final
Report is forwarded in support of the Readiness to Proceed Memorandum.
The team also prepares a lessons learned report concerning the ORR and the ORR process. The lessons
learned may be part of the ORR Final Report but must be in a format to stand alone for use by other ORR
teams and team leaders. Through these lessons learned continuous improvement of the ORR process is
achieved.
5.5 Documentation of the ORR Results (Both Responsible Contractor and DOE). The validity of,
and the ability to defend, the results of an ORR depends in large part on the thoroughness with which the
process and the observations are documented. The record of the ORR must be clear as to what was
evaluated and the methodology used during the evaluation. The criteria in the Implementation Plan are
the "what." The record must clearly record the "how" that leads to the conclusions reached concerning
the particular criteria. The Implementation Plan specifies a standardized method to record the assessment
process for each criteria including what was inspected, what records were reviewed, who was
interviewed, and what procedures were observed. Form 1 (see Appendix 4) is a sample Assessment
Form which can be utilized to describe the steps in the criteria evaluation process.
During the ORR, it is expected that the team will identify individual deficient conditions. Frequently, the
deficient conditions, when evaluated in aggregate, reflect a programmatic or implementation weakness
41