Click here to make tpub.com your Home Page

Page Title: Appendix D: Canceled DOE Standards - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-TSL-1-2007
APPENDIX D
CANCELED DOE STANDARDS
DATE
DOCUMENT
TITLE
CANCELED
REASON
NE F 3- 2T
Calibration Program Requirements (2/73)
07/96 No longer needed
NE F 3- 6T
Nondestructive Examination (Supplement
07/96 No longer needed
to ASME Boiler and Pressure Vessel
Code, Section V) (2/83)
NE F 3- 7T
Inspection Requirements for Materials
07/96 No longer needed
Used in Reactor Coolant System Wear
Applications (10/67)
NE F 3-10T
Nondestructive Examination of Reactor
07/96 No longer needed
Core Components (w/Amendments 1 and
2) (7/80)
NE F 3-11T
Mass Spectrometer Helium Leak
07/96 No longer needed
Detection for Instruments and Small
Components (2/72)
NE F 3-15T
Requirements for Inspection of
03/89 Replaced by ASQC
Dimensional Characteristics (8/73)
M1 (1987)
NE F 3-37T
Special Requirements for Metal Products
04/75 No longer needed
(5/74)
NE F 3-39T
Testing of High Temperature Cable for
07/96 No longer needed
Nuclear Detectors (8/71)
NE F 3-40T
Methods for the Analysis of Sodium and
04/84 Replaced by ASTM
Cover Gas (w/Amendments 1 and 2)
C997-83
NE F 3-41T
In-Place Testing of HEPA Filter Systems
07/96 Replaced by ASTM F
by the Single-Particle, Particle-Size
1471-93
Spectrometer Method (12/81)
NE F 3-42
Operating Policy of DOE Filter Test
05/98 Replaced by DOE-
STD-3022-98
NE F 3-43
Quality Assurance Testing of HEPA Filters
02/99 Replaced by DOE-
STD-3025-99
NE F 3-44
DOE Filter Test Facilities Quality
02/99 Replaced by DOE-
Program Plan
STD-3026-99
NE F 3-45
Specifications for HEPA Filters Used by
02/97 Replaced by DOE-
DOE Contractors
STD-3020-97
NE F 4-20T
Operation and Maintenance Manuals
07/96 No longer needed
NE F 5- 1T
Cleaning and Cleanliness Requirements
07/96 No longer needed
for Nuclear Components (1/78)
NE F 5- 9T
Sodium Removal Processes (4/77)
07/96 No longer needed
NE F 5-10T
Decontamination of Hot Leg LMFBR
07/96 No longer needed
Components (2/84)
NE F 6- 2T
Welding of Reactor Core Components
07/96 No longer needed
and Test Assemblies (7/73)
D-15


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business