| DOE-HDBK-1078-94
EXERCISE PREVIEW--CLASSROOM (Continued)
Instructor Outline
Trainee Activity
SCENARIO OVERVIEW AND REVIEW
2.
(Continued)
(c)
Applicable technical spec-
Review TS 3/4.4.1 and Power Flow Map
ifications (list:).
Respond to instructor questions.
(d)
Applicable emergency pro-
Review Plant Procedure 4.2.1.7
cedures (list:)
(Primary Cooling Pump Seal
Failure)
-
TS 3/4.3.2
-
TS 3/4.1.1
-
TS 3/4.4.1.
(e)
Applicable technical spec-
Review applicable technical spe-
ifications (list:).
cifications for reactor leakage and
single primary cooling loop
operation:
d.
Primary Cooling Pump Trip
(1)
Symptoms (Control Room indi-
Respond to instructor questions:
cations) (list:)
Turbine trip
Flow coastdown
Reactor power decrease
Primary pump suction or discharge
valve closed.
(2)
Operator Actions (use the generic
outline):
(a)
Applicable alarm response
Review Alarm Response Proce-
procedures (list:)
dure 4.602.A13-4.5 (Primary
Cooling Pump Turbine Trip)
Review Alarm Response Proce-
dure 4.602.A6-4.7 (Primary
Cooling Pump Trip)
(b)
Plant abnormal proce-
Review Abnormal Proce-
dure(s) (list:)
dure 4.2.1.10 (Loss of Core Flow).